
PLEASE READ BEFORE STARTING INSTALLATION While MBRP Inc. has made every effort to ensure that all components of this system are of superior quality
S6206304 “PRO SERIES” S6206AL “Installer Series” S6206409 “XP SERIES” 1 PC - Down Pipe 1 PC - Down Pipe 1 PC
5. Remove the down pipe from the turbo by removing the band clamp using an 11mm socket. Retain the band clamp for the installation of the new do
5. Install the Muffler over the Extension Pipe. The Hanger Clamp is used at the connection between the Muffler and the Extension Pipe
Komentáře k této Příručce